Pages

Download SAP Certification Material for FREE @ http://sap-ebooks-den.blogspot.com

Friday, April 11, 2008

TMS : Setting up an R/3 Transport Landscape

1. Make the transport directory available.
2. Configure the transport domain controller and define the domain.
3. Configuration of the transport program (tp) is done automatically and
must not be done at OS level.
4. In the TMS:
- Include all remaining systems in the domain
- Define the transport routes
- Define QA approval procedure
5. Set the system change options according to the role of the R/3 System.
6. Create clients and set the client change options for the production system,
development system, and so on.


The steps for setting up a transport landscape are summarized below.
 To set up an R/3 transport landscape:
 Make a transport directory available to every R/3 System that will be ransporting.
The TMS allows a local transport directory for every R/3 System.
 To configure the TMS, define the transport domain controller.
 In the TMS:
- Include all remaining systems in the domain.
- Define the transport routes.
 Set the system change options according to the role of the R/3 System.
 Create clients in every R/3 System and set the client change options (production
system, development system, and so on).

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...